With a length of approx. 400m and a draft of 9m, the Ethiopia pier is one of the more important pier in Genoa.
Aim of monitoring:
The proposed monitoring system was designed in order to allow the control of behavior of dock during the excavation of the seabed and during operation.
Main results:
MuST system integrated in a narrow service tunnel inside the pier structure
INSTALLATION PERIOD | TYPE OF SENSORS | NUMBER OF SENSORS |
2005 – 2007 | MuST | 8 |