High speed railway tracks are installed on approximately 6 m long concrete slabs. The sensors are installed on the joints between two slabs.
Aim of monitoring:
The main aim of the project is to monitor relative movement between concrete railway slabs. Measurement in the lateral and vertical directions are periodically performed with a required accuracy in both directions of 0.05 mm.
INSTALLATION PERIOD | TYPE OF SENSORS | NUMBER OF SENSORS |
2006 – 2007 | MuST | 134 |